Throughout a product’s lifecycle, performance or process issues may necessitate changes to a product’s specifications. Often, these changes to specifications can take the form of a process or component change to the product’s bill of materials. In the manufacturing space, tracking these changes is important and over time a product may undergo a series of revisions which need to be tracked for regulatory or internal quality control purposes.
These changes may also need to go through approval by several personnel before a change can be implemented to the product’s manufacturing process. NetSuite’s engineering change order module can help you manage this process and provide a centralized approach for reviewing these changes.
The engineering change order module comes included with the Supply Chain Management SuiteApp. In addition to having the SuiteApp installed, the following features will need to be enabled to fully utilize the engineering change order module:
Enabling these two features allow the engineering change order module to implement changes to bill of materials once they have been approved, and the SuiteApprovals bundle itself provides the mechanism for routing engineering change order approvals to the correct personnel. Note that Legacy BOM is not supported, but you can still use the engineering change order records in your process. However, you will not be able to utilize NetSuite’s engineering change order implementation function which I’ll cover below.
Once the pre-requisite features have been enabled, the engineering change order module can be enabled by navigating to:
Finally, note that you will need to add engineering change order permissions to any custom roles. For a comprehensive guide on setup procedures, refer to the following SuiteAnswers article: https://suiteanswers.custhelp.com/app/answers/detail/a_id/76402
Now that we’ve set up the feature, we’re ready to use it. To create an engineering change order, navigate to Lists > Engineering > Engineering Change Order > New:
After the engineering change order is saved, it will be routed through approval to the designated personnel. The SuiteApprovals portion is beyond the scope of this article, but regardless, you have the option to automatically implement the change order once it has received final approval. Otherwise, you can manually implement the change order. Once you implement the change order, NetSuite will make any necessary changes to the impacted assembly items and will also create any new BOM revisions based on your inputs if needed.
The engineering change orders will be stored in NetSuite and can be reviewed at any time by navigating to the Engineering Change Order Page. Additionally, the engineering change orders support saved searches and saved search alert emails as well, providing you with full visibility into engineering change order activity.
About Us
Concentrus is a leading provider of innovative cloud-based enterprise resource planning (ERP) solutions, including NetSuite. Our team of NetSuite experts offers a range of services, including NetSuite price analysis, NetSuite training, and NetSuite integration services.
Our goal is to help businesses of all sizes maximize their investment in NetSuite by providing expert NetSuite cost optimization and implementation strategies. With years of experience as a NetSuite partner, our NetSuite administrators and NetSuite consultants are well equipped to help businesses of all sizes with their NetSuite consulting needs.
Whether you're looking for a NetSuite consultant to help with your NetSuite implementation or you need ongoing NetSuite support, Concentrus is here to help.
Read About Our Implementation Methodology
Want more NetSuite Tips and Tricks? Check out our Short & 'Suite videos